Integrating system dynamics and fuzzy logic modeling to determine concession period in BOT projects

journal contribution
posted on 2012-03-01, 00:00 authored by M Khanzadi, Farnad NasirzadehFarnad Nasirzadeh, M Alipour
The concession period is one of the most important decision variables in arranging a BOT-type contract which should be determined considering the existing risks and uncertainties. This research presents an integrated fuzzy-system dynamics (SD) approach for determination of concession period. The complex inter-related structure of different factors affecting a BOT project is modeled using the system dynamics approach. Owing to the imprecise and uncertain nature of different factors affecting the concession period, fuzzy logic is integrated into the system dynamics modeling structure. The values of different factors affecting the concession period are determined by fuzzy numbers based on the opinions of different experts involved in the project. The application of Zadeh's extension principle and interval arithmetic is proposed for the system dynamics to enable the system outcomes to be presented considering uncertainties in the input variables. To evaluate the performance of the proposed method, it has been employed in a highway project.

History

Journal

Automation in construction

Volume

22

Pagination

368 - 376

Publisher

Elsevier

Location

Amsterdam, The Netherlands

ISSN

0926-5805

Language

eng

Publication classification

C Journal article; C1.1 Refereed article in a scholarly journal

Copyright notice

2011, Elsevier B.V.

Usage metrics

    Research Publications

    Categories

    No categories selected

    Exports

    RefWorks
    BibTeX
    Ref. manager
    Endnote
    DataCite
    NLM
    DC