Deakin University
Browse

File(s) under permanent embargo

Optimisation of Bacillus thuringiensis var. israelensis (Vectobac) applications for the blackfly control programme on the Orange River, South Africa

journal contribution
posted on 2008-04-01, 00:00 authored by N Rivers-Moore, Shaun BangayShaun Bangay, R Palmer
The Orange River, South Africa’s largest river, is a critical water resource for the country. In spite of the clear economic benefits of regulating river flows through a series of impoundments, one of the significant undesirable ecological consequences of this regulation has been the regular outbreaks of the pest blackfly species Simulium chutteri and S. damnosum s.l. (Diptera: Simuliidae). The current control programme, carried out by the South African National Department of Agriculture, uses regular applications, by helicopter, of the target-specific bacterial larvicide Bacillus thuringiensis var. israelensis. While cost-benefit analyses show significant benefits to the control programme, benefits could potentially be further increased through applying smaller volumes of larvicide in an optimised manner, which incorporates upstream residual amounts of pesticide through downstream carry. Using an optimisation technique applied in the West African Onchocerciasis Control Programme, to a 136 km stretch of the Orange River which includes 31 blackfly breeding sites, we demonstrate that 28.5% less larvicide could be used to potentially achieve the same control of blackfly. This translates into potential annual savings of between R540 000 and R1 800 000. A comparison of larvicide volumes estimated using traditional vs. optimised approaches at different discharges, illustrates that the savings on optimisation decline linearly with increasing flow volumes. Larvicide applications at the lowest discharge considered (40 m3·s-1) showed the greatest benefits from optimisations, with benefits remaining but decreasing to a theoretical 30% up to median flows of 100 m3·s-1. Given that almost 70% of flows in July are less than 100 m3·s-1, we suggest that an optimised approach is appropriate for the Orange River Blackfly Control Programme, particularly for flow volumes of less than 100 m3·s-1. We recommend that trials be undertaken over two reaches of the Orange River, one using the traditional approach, and another using the optimised approach, to test the efficacy of using optimised volumes of B.t.i.

History

Journal

Water SA

Volume

34

Issue

2

Pagination

193 - 198

Publisher

Water Research Commission

Location

Pretoria, South Africa

ISSN

0378-4738

eISSN

1816-7950

Language

eng

Publication classification

C1.1 Refereed article in a scholarly journal; C Journal article

Copyright notice

2008, Water Research Commission

Usage metrics

    Research Publications

    Categories

    No categories selected

    Exports

    RefWorks
    BibTeX
    Ref. manager
    Endnote
    DataCite
    NLM
    DC